Global platform for infrastructure and energy bottlenecks

What stalls a project is usually already on the public record.

TG-DEG traces grid queues, permitting fights, water limits, environmental permits and failing transport links, and turns them into briefings for the people deciding where to build, buy or invest.

DetailPoint at any part of the drawing, or tap it, to read what it shows.

Five kinds of bottleneck decide whether a project gets built.

Each figure is taken from a public source, linked on the card, and opens its full case on the map.

Grid connection 15,498 requests waiting for capacity at Dutch regional grid operators in mid-2026. Source: Solar Magazine, 24 Oct 2026
Local approval 25 of 92 Indiana counties with a moratorium on new data centres, while the state courts them. Source: The Bond Buyer, Sep 2026
Water 5 million gallons of lake water a day: the expected draw of a Texas data centre that was withdrawn. Source: The Texas Tribune, 23 Jul 2026
Environment 3–12 months of delay a nitrogen exemption could save Dutch grid projects, if Brussels agrees. Source: Solar Magazine, 14 Sep 2026
Transport $5.2bn upper estimate for rebuilding Baltimore's Key Bridge, first put at about $1.9 billion. Source: Bloomberg Government, 18 Nov 2025

The map

Every bottleneck is a place, with a status you can read at a glance.

    cases on the map todayOpen the map

    Residents, regulators and grid operators raise these concerns long before a project is cancelled. TG-DEG treats them as due diligence.

    A business-to-business information and consultancy service. It takes no side for or against a project; it reports what the record says.

    Built for the people who carry the decision.

    Before a term sheet

    Investors and acquirers

    What could delay or strand the asset, which decisions are still pending, and who takes them.

    Before a site is chosen

    Developers and site selectors

    The connection queue, the water source, the zoning record and the neighbours, for data centres, industry and storage.

    Before a partnership

    Public bodies and partners

    Where a public bottleneck is holding back private projects, and what a shared solution would need.

    From public record to briefing.

    Trace

    Grid operators' capacity updates, regulators' decisions, court rulings, government letters and project notices, collected per location.

    Brief

    Each case keeps what the sources say apart from what to check. Every statement is linked and dated.

    Advise

    For a specific site or transaction: the bottlenecks that apply, the decisions pending, and who takes them.

    Coverage, continent by continent.

    Two continents are live. The other four open as their first cases are researched and sourced. Nothing is listed before it can be checked.

    Live

    Europe

    The Benelux first: grid congestion, nitrogen permits and data-centre connections.

     cases · open the map
    Live

    North America

    The United States first: large-load queues, capacity markets, county moratoria, water, air permits and transport megaprojects.

     cases · open the map
    Planned

    South America

    First topics: transmission bottlenecks and curtailment of wind and solar; port and rail access.

    Planned

    Africa

    First topics: grid capacity for new generation; freight rail and port corridors.

    Planned

    Asia

    First topics: power and water for data centres; grid connection queues.

    Planned

    Australia

    First topics: transmission build-out for renewable zones; local approval of large projects.

    Where the platform stands.

    cases, each with dated sources
    2regions covered

    Sources last checked on 25 November 2026.

    • Live now
      A curated map of grid, approval, water, environment and transport cases in the Netherlands, Belgium and the United States.
    • Next
      Monitoring of operator and regulator publications, so a case changes when its source does.
    • Next
      Detail per substation and per county, and coverage of more countries.
    • Planned
      A network of local contributors who add and verify cases.